A Windows day plan you can actually finish

Start with one study session and one project action, then save the work you really completed.

A practical example

An evening has room for one reading session and checking a portfolio caption. A list of every unfinished project would hide these two commitments.

Choose the right action

Add a manageable study entry and select the existing project task. Keep other possibilities in their projects. Choosing today's work and completing it are separate decisions.

Steps in My Day

  1. In Study, use Subjects and materials to create a study subject such as English. Add subtypes when different activities need separate records: Listening, Reading or Grammar. A subtype can contain further subtypes, and each entry has its own material description and stopping-point note.
  2. Add the subject or subtype you want to study to My Day. In Planned focus sessions, choose between one and four focuses for that entry. Each focus represents 25 minutes, so two planned focuses represent 50 minutes. Different active subtypes can be included in the same day.
  3. Use + My day beside a final action to include it in the current day. A final action is a task without active subtasks. You can also choose an unfinished final action from the day's task picker. A calendar date and inclusion in My day are separate choices.
  4. In My day, mark Done when the action is complete, then choose Save results. These day checkboxes first stage your results. Checking a task directly in Projects or Project calendar instead submits that change for saving immediately. Complete the day saves pending day marks and records the day's results in history. Save or discard pending day marks before changing task details elsewhere.
  5. When you are ready to finish the current plan, choose Complete the day and confirm. Choose New day, select the next date and confirm with Open a day. The new plan starts empty: add the study entries and available project tasks you want for that day. Unfinished work is not automatically copied into tomorrow’s plan.

Check the outcome

After working, save the actual marks and a precise continuation note. The next day starts empty; choose the next commitments deliberately.

  • In My day, marking a focus block or a project task first holds a pending result. Choose Save results to commit those marks. Statistics reads the saved state, so its totals can differ from the marks you can currently see in My day until you save them.