My Day✳All blog articles ↗

Finish one portfolio case without closing every branch

A portfolio becomes manageable when a task has a specific output and a clear check. Keep that check narrower than the project's overall presentation goal.

A practical example

A photographer's portfolio project might include image selection, captions and a contact page. For one end task, specify a folder containing six selected photographs and a checked caption file. Completing that selection does not complete the contact page or every caption task in another branch.

Choose the right action

Save the audience and overall purpose in the project note. Put the output location and acceptance condition in the end task's own note. Add a date only when useful, and select a daily task separately.

Steps in My Day

  1. Create the portfolio project and write its audience and intended result in the project note.
  2. Add groups and concrete final subtasks through the existing project forms.
  3. Give each final task a file reference, next action and completion criterion; save the editor.
  4. Optionally set a calendar date, then select one available final task with + My day.
  5. Perform the external check and save the actual result using the control appropriate to Projects or the day.

Check the outcome

Open the output before recording completion. Use the task tree to see what remains instead of closing a parent group to make the percentage look finished. A saved file reference is a note, not an automatic file inspection.

  • Open one end task and check that its note points to an output file and a clear acceptance condition.
  • Inspect that output before completing the task. Choosing a date or finishing a parent group is not a substitute for checking each result.