My Day✳All blog articles ↗

A completed day has one missing study block: correct that record

Reopening the latest completed day corrects its results without restoring the whole diary.

A practical example

Two study blocks were genuinely completed, but only the first was ever marked before the day closed. The saved result is therefore 25 minutes.

Choose the right action

Use the available return-to-editing action for the latest completed day. A current plan containing entries is not empty even if none is complete; do not erase that work just to reopen another day.

Steps in My Day

  1. A changed focus or task mark in My day remains pending until Save results succeeds. If the pending marks are wrong, correct them or use Reset beside the save control. Reset clears those pending marks together; it leaves the saved day in place. Confirming Complete the day also saves pending marks before closing the day.
  2. Last means the most recently completed record in the diary. It is not a choice of any calendar date. While that completed day is displayed in My day, use Return to editing. If you have already opened a new empty day, choose Another day and use Reopen the last completed day in its form.
  3. The current open plan must contain no study entries or project tasks. A plan with entries and zero completed items is still nonempty. Keep that work; do not remove it simply to make reopening available. The referenced subjects and tasks must also still exist. These controls do not let you skip a newer completed record to edit an older one.
  4. The saved result now shows two completed focuses and 50 minutes. When its date is in the selected Statistics period, the corrected day is counted once, including while it remains open after saving. Pending corrected marks do not change the saved total.
  5. When finished, choose Complete the day and confirm. To start 21 October, choose New day, select the date and confirm with Open a day. That next plan starts empty; add the entries you intend to use. The weekly-review guide explains the date filters and saved totals in more detail.

Check the outcome

Save the second real block and check 50 recorded minutes in a range containing the day. Reopening is not a way to select any older date or recover all former notes.

  • Reopening reconstructs the daily plan and its saved marks using current subject and project information. It does not restore all earlier subject names, stopping-point notes or project task states across the diary. Saving a changed project mark can also change the actual project task and its completion.