Review the previous full week rather than a partial week

Choose the dates before interpreting a percentage or comparing two periods.

A practical example

On Friday, This week includes Monday through Friday. Comparing it with a complete seven-day week would mix different periods.

Choose the right action

Save pending results, then set the previous Monday and Sunday explicitly and apply the range. Both dates are included. Read saved focus blocks and daily project entries as separate measures.

Steps in My Day

  1. In My day, marking a focus block or a project task first holds a pending result. Choose Save results to commit those marks. Statistics reads the saved state, so its totals can differ from the marks you can currently see in My day until you save them.
  2. Open Statistics and use Period. Today selects the current local date on your computer. This week runs from Monday through today, and This month runs from its first day through today. All time removes the date limits. These presets apply when you select them.
  3. To review a previous complete week, choose dates from its Monday through Sunday in From and To, then choose Show. Both selected dates are included. The filter uses the date of each daily plan, so a task’s calendar date does not move its saved day result into a different period.
  4. Study this period compares all completed focus blocks with all planned blocks in the selected dates. Daily activity shows the saved results for each date. Subjects and subtypes and Tasks by project help you see where those records belong. A day with a plan and zero completed items still counts among days with entries; an entirely empty day does not.
  5. Use the records to choose what you want to do next. Update a study stopping-point note or a project task note in its own form when you need a clearer continuation, and save that form. A note belongs to its subject or task; it is not an automatically generated weekly report.

Check the outcome

Record one practical next action from that review. A project-wide completion percentage uses a different task set and need not match the daily report.

  • The overall percentage in Projects uses the project’s active final tasks, meaning tasks without active subtasks. If a project has four such tasks and one is complete, its progress is 25%. That can correctly differ from the example’s 50% of daily project entries. Neither percentage measures project working hours or the effort still required.