Reduce a four-focus plan after two focus units are saved
A smaller plan should reflect the remaining capacity without erasing work already recorded. Read the saved completed value before changing today's plan.
A practical example
In this example, the plan was four focus units and two have been completed and saved. Changing the plan to two is consistent with that saved work. Changing it to one is not: two correct completed units should not be deleted to force a smaller target.
Choose the right action
Check the open day and the intended study row. Resolve pending daily or board changes first, then choose a valid plan between one and four that is not below saved completion. Wait for the plan save and inspect the result.
Steps in My Day
- Check the date of the open day and expand the study item you intend to change.
- Finish saving, resolve board changes and save or deliberately discard pending daily marks according to what really happened.
- Read the saved completed count and choose a realistic number from one to four in Plan, never below completed work.
- Wait for the direct plan save; leave truthful completed marks unchanged.
- Verify the new plan and unchanged completed count. If the choice is rejected, check saved state rather than erasing real work.
Check the outcome
The changed target and the original two completed units should both remain. Those units represent 50 calculated study minutes. Adjusting the plan does not correct an inaccurate past completion record or rewrite a finished day's history.
- Check the saved plan and completed focus units together; the plan must not be below work already saved.
- Reopen the day and confirm true completed work remains. Do not erase completed units just to make a smaller plan possible.