PRACTICAL GUIDE · WINDOWS
Reduce today's study plan while keeping completed work
A plan can become too large after the day has started. If two study sessions are already finished and your available time changes, adjust what remains instead of rewriting the work you actually completed.
My Day lets you change the planned focus count for an item in the current open day. The useful result is an achievable remaining plan and an honest record of completed study.

Read the saved result before changing the target
Open the intended day and expand the study item's row. Read its completed and planned counts together. A focus unit contributes 25 calculated minutes when recorded; this is accounting based on your marks, not an automatically measured session.
This operation concerns the open day's plan. A closed day's disabled controls do not provide a way to rewrite any date in your history.
Finish pending changes, then choose the plan
Wait for an active save to finish. Save truthful pending day marks with Save results, or discard only marks you did not intend to retain. Resolve unsaved learning-board changes separately before changing the plan.
- Check the date of the open day and expand the study item you intend to change.
- Finish saving, resolve board changes and save or deliberately discard pending daily marks according to what really happened.
- Read the saved completed count and choose a realistic number from one to four in Plan, never below completed work.
- Wait for the direct plan save; leave truthful completed marks unchanged.
- Verify the new plan and unchanged completed count. If the choice is rejected, check saved state rather than erasing real work.
Example: four planned, two completed, three now realistic
Suppose the saved row shows two completed units out of four planned: 50 calculated minutes. You can manage one more unit, so change Plan to three. After the change is saved, the row should show two of three and the same 50 minutes. One unit remains.
A plan of one is below the two already saved completed units and is rejected. Keep the true completed count at two. Read the message and verify the saved state before continuing; do not assume a rejected choice automatically restores the visible selector.
Distinguish saving a plan from marking completion
Selecting a valid number in Plan sends the plan change directly for saving. It does not mark the remaining unit complete. Daily completion checkboxes are a separate operation, retained through Save results.
Changing a material's Where I left off is also separate. If your next exercise changes, save that instruction in its editor; a smaller plan does not update the note for you.
Verify what remains
Read the row again: the saved planned count should have changed, while the completed count should describe the same real work. Revisit the saved state if an error appears. A better completion percentage alone is not evidence that more work happened.
For a first setup, use the installation guide; for broader reflection, read the weekly review. Access costs 30 USDT per calendar year for one computer. A second computer needs a separate licence.
Check the result before you finish
- Check the saved plan and completed focus units together; the plan must not be below work already saved.
- Reopen the day and confirm true completed work remains. Do not erase completed units just to make a smaller plan possible.
Questions about this guide
- Can I plan one unit after saving two completed units?
- No. The plan must be at least the saved completed count. Keep the two real results and choose a valid plan.
- Does reducing the plan start or shorten a timer?
- No. Focus units represent recorded study work and 25 calculated minutes each; changing their plan does not measure elapsed time.
- Do I need to save daily marks again just to retain the new plan?
- The plan selection saves directly. Pending completion marks have their own save, so resolve them before changing the plan.