My Day✳All blog articles ↗

Check linked assets before moving a project folder

Copying a document does not establish that an external image travels with it.

An image may be embedded in a document or linked from a separate file. Establish which applies before moving the project. For a link, record the source asset's path and prepare a separate complete copy. Opening the document on the original computer alone does not establish that the new folder contains everything needed.

1 document; 1 externally linked asset
1 document; 1 externally linked asset

What to do

  1. Check in the editor whether the resource is embedded or externally linked.
  2. Keep the original and prepare a separate copy with the required asset and working link.
  3. Check the link target in the new copy, then reopen the document and inspect the image.

Example

Fictional example: 1 Draw document, project.odg, links to 1 external images/cover.png. By the example's conditions, a document-only destination lacks that target. Prepare a complete separate copy, check the path and reopen to inspect the image. Retain the original.

My Day · Windows

My Day can manually record paths and results; moving happens separately.

Buy My Day for Windows ↗