Find a circular dependency in a work plan
Changing a date does not break a loop of required conditions.
Sometimes A requires B, while B requires a finished A. First check whether those conditions are mandatory. If they are, change a dependency or agree a preliminary result instead of merely moving dates.
What to do
- Write the specific result each job requires before it can proceed.
- Trace the conditions backwards and mark where they return to the original job.
- Discuss a changed condition or permitted draft, saving the agreed decision separately from the final result.
Example
Fictional example: 2 jobs block each other: choose a heading from a finished layout, but layout requires the final heading. People agree 1 preliminary heading for a trial layout. The trial can proceed; the final heading remains unapproved.