Separate touch-dry from fully cured
Name both finish stages and count their stated times from the instruction’s specified starting point.
A finish can become touch-dry before it is fully cured. Use the chosen material’s instructions and conditions, keeping these stages separate. Recording surface dryness does not complete curing. Elapsed time alone also cannot replace a readiness check required by those instructions.
What to do
- Record each stage, its conditions and the specified common timing origin.
- Mark the confirmed stage separately, leaving the full-cure task unfinished.
- Check the required readiness before taking the next action permitted by the instructions.
Example
Fictional Finish-A specifies touch-dry at 1 hour and full cure at 24 hours after application. At hour 1, only the first stage is confirmed; 23 hours remain to the second stated time. These are not Mod Podge timings, and full cure remains unconfirmed.
My Day · Windows
In My Day, manually save the checked details in a project note and add the next checking task.