My Day✳All blog articles ↗

Group independent work by shared setup

Choose a permitted order with fewer setup changes without inventing dependencies.

Independent actions can share a setup. Grouping them does not create a required predecessor. Check constraints first, then count setup transitions without claiming a measured time saving.

Setup changes: 2 for ABC; 1 for ACB
Setup changes: 2 for ABC; 1 for ACB

What to do

  1. Confirm that every action is ready and may be reordered here.
  2. Label each action's setup and count changes between neighbouring actions.
  3. Choose a permitted order and record it as a preference, not a dependency.

Example

Fictionally, A and C need red labels; B needs blue labels. All actions are independent and any order is permitted. A, B, C needs 2 changes after initial setup; A, C, B needs 1. Choose A, C, B. B does not thereby require C to finish first, and no minutes were measured.

My Day · Windows

Manually save this personal record in My Day.

Buy My Day for Windows ↗