Keep a truthful gap in a creative series
A later work can revisit an idea while retaining its real creation date and the original gap.
In a dated creative series, distinguish a planned slot from a work actually made. Keep a missed slot visible. Revisit its idea later with the real creation date and a link to the earlier intention. The record preserves the original sequence and its later continuation.
What to do
- Match the original series dates to works that actually exist for those dates.
- Leave the missing slot as a gap and separately name the idea to revisit.
- Date the later work by its actual creation and link it to the earlier slot.
Example
Fictional example: a 1–3 November series has 3 slots. Works dated 1 and 3 November exist: 2 works, 1 gap on the 2nd. A replacement idea is photographed on 4 November. Its date stays the 4th; the original gap remains.
My Day · Windows
Manually save both dates, the idea link and the actual result in My Day.