My Day✳All blog articles ↗

Remove an overlap in one person’s plan

Check overlaps even when the total work duration fits.

Enough total minutes do not guarantee a feasible schedule. One person cannot give two tasks full attention simultaneously. If their starts are flexible, check a rearrangement inside the window before abandoning either result.

A: 30 minutes; B: 30; original overlap: 10
A: 30 minutes; B: 30; original overlap: 10

What to do

  1. Write each task’s start, finish and performer alongside its actual constraints.
  2. Find any interval assigned twice to the same person, beyond adding durations.
  3. Move a flexible block, then recheck the window boundaries and all overlaps.

Example

Fictional model: one person, 09:00–10:00, independent A and B requiring 30 minutes each, with no additional setup. A is 09:00–09:30; B is 09:20–09:50, overlapping for 10 minutes. Moving B to 09:30–10:00 fits both sequentially. The 60-minute workload is unchanged. These are model conditions, not a workplace standard.

My Day · Windows

Save this note manually in My Day.

Buy My Day for Windows ↗