My Day✳All blog articles ↗

Finish an inspection without accepting the item

A completed inspection report does not establish that the inspected material is ready.

Inspecting an item and making it work are different assignments. A complete inspection may reveal a defect. Read the original requirement: if it calls for a working finished item, a report alone does not complete the whole assignment or establish acceptance.

3 links inspected; 2 open; 1 fails
3 links inspected; 2 open; 1 fails

What to do

  1. Read the task criterion: inspect and record only, or also repair the material.
  2. Record the outcome for every inspected point, including negative observations.
  3. Mark the inspection against its criterion while keeping the repair as a separate open action.

Example

Fictional example: the task is “Check 3 links and record the result”. A and C open; B does not. There are 3 inspected links, 2 opening and 1 failing. The report is complete. “Repair B” remains open, and the booklet is not accepted.

My Day · Windows

In My Day, manually save the observations and track your repair task separately with its eventual result.

Buy My Day for Windows ↗