Finish an inspection without accepting the item
A completed inspection report does not establish that the inspected material is ready.
Inspecting an item and making it work are different assignments. A complete inspection may reveal a defect. Read the original requirement: if it calls for a working finished item, a report alone does not complete the whole assignment or establish acceptance.
What to do
- Read the task criterion: inspect and record only, or also repair the material.
- Record the outcome for every inspected point, including negative observations.
- Mark the inspection against its criterion while keeping the repair as a separate open action.
Example
Fictional example: the task is “Check 3 links and record the result”. A and C open; B does not. There are 3 inspected links, 2 opening and 1 failing. The report is complete. “Repair B” remains open, and the booklet is not accepted.
My Day · Windows
In My Day, manually save the observations and track your repair task separately with its eventual result.