Separate alternatives from required work
When one route is enough, avoid turning every possible route into a required task.
A list of ideas can resemble a list of commitments even when different methods could produce the result. First establish whether all options are required or only one. Keep alternatives as options until a choice is confirmed, then plan the selected route.
What to do
- Describe the required result and ask whether one proposed method is sufficient.
- Compare options against the conditions and confirm which route is selected.
- Record actions for that route, keeping the other possibilities in a separate note.
Example
Fictional example: an instruction needs either 1 diagram or 2 photos, not both. Of 2 routes, the author confirms 1: photos. The plan says “Prepare two photos”; the diagram remains an alternative rather than unfinished required work.
My Day · Windows
In My Day, manually create the selected task and keep the unselected route in an ordinary note.