My Day✳All blog articles ↗

Separate alternatives from required work

When one route is enough, avoid turning every possible route into a required task.

A list of ideas can resemble a list of commitments even when different methods could produce the result. First establish whether all options are required or only one. Keep alternatives as options until a choice is confirmed, then plan the selected route.

2 possible routes; 1 selected; 2 required photos
2 possible routes; 1 selected; 2 required photos

What to do

  1. Describe the required result and ask whether one proposed method is sufficient.
  2. Compare options against the conditions and confirm which route is selected.
  3. Record actions for that route, keeping the other possibilities in a separate note.

Example

Fictional example: an instruction needs either 1 diagram or 2 photos, not both. Of 2 routes, the author confirms 1: photos. The plan says “Prepare two photos”; the diagram remains an alternative rather than unfinished required work.

My Day · Windows

In My Day, manually create the selected task and keep the unselected route in an ordinary note.

Buy My Day for Windows ↗