Separate batch setup from time per item

Do not multiply a one-time setup by the item count.

If setup is needed once for the entire batch, count it separately from repeated work. Identify what actually repeats for each item, then add setup to quantity multiplied by time per item. This is a sequential-work model, not a guarantee of exact duration.

Setup 15 minutes, item work 12, total 27
Setup 15 minutes, item work 12, total 27

What to do

  1. Separate one-time stages from stages repeated for every item.
  2. Record the item count and an illustrative duration per item. Use one time unit throughout the calculation.
  3. Calculate the sum and add known breaks or extra operations separately when applicable.

Example

Fictional example: setup takes 15 minutes, followed by 3 items at 4 minutes each: 3×4=12, so 15+12=27. No setup repeats between items.

My Day · Windows

My Day can hold the calculation in a project note. It is a planning estimate, not an automatically saved focus result.