Separate hands-on time from waiting

The full chain can take longer than the active work.

A small object may involve actions and waiting periods. Record them separately before promising a finish time. Waiting depends on the chosen material; check its instructions.

20 minutes preparation, 30 waiting, 10 assembly
20 minutes preparation, 30 waiting, 10 assembly

What to do

  1. Split the process into actions and necessary waits, noting which stage cannot begin until the previous one finishes.
  2. Estimate active work separately, then calculate the full sequential chain; do not assume overlapping stages without checking feasibility.
  3. Afterwards compare plan and reality and refine the next estimate, keeping labour distinct from time spent waiting.

Example

Fictional example: Olya plans 20 minutes cutting, 30 drying and 10 assembling. Without overlap, that is 30 minutes of work and 60 for the chain.