Separate hands-on time from waiting
The full chain can take longer than the active work.
A small object may involve actions and waiting periods. Record them separately before promising a finish time. Waiting depends on the chosen material; check its instructions.
What to do
- Split the process into actions and necessary waits, noting which stage cannot begin until the previous one finishes.
- Estimate active work separately, then calculate the full sequential chain; do not assume overlapping stages without checking feasibility.
- Afterwards compare plan and reality and refine the next estimate, keeping labour distinct from time spent waiting.
Example
Fictional example: Olya plans 20 minutes cutting, 30 drying and 10 assembling. Without overlap, that is 30 minutes of work and 60 for the chain.
My Day · Windows
In My Day, save stages and your estimates in a project note; the app does not calculate material drying.