PRACTICAL GUIDE · WINDOWS

Understand the percentage shown beside your project

A project percentage is useful only when you know what it counts. In My Day the whole-project figure is based on available named tasks with no available child tasks.

These final tasks are often called leaves: they sit at the ends of the task tree. A parent used to group several subtasks is not another equal task in the same count.

Painted illustration: two students planning their study at a library table.

Count the available final tasks

The calculation excludes archived or hidden tasks, finds the remaining tasks that are not parents of another available task, and counts those with a nonblank title. Every counted final task has equal weight.

The displayed percentage is completed final tasks divided by all counted final tasks, multiplied by 100 and rounded to the nearest whole number. With no counted tasks the figure is 0%, which is not a verdict on effort.

Read the tree before interpreting the number

Expand the project and relevant parent branches. Read which tasks are actual endpoints, then compare the done count and total with the displayed percentage.

  1. Open Projects and the project whose percentage you want to understand.
  2. Expand the relevant branches and identify available named tasks without available children.
  3. Count completed endpoints and all endpoints; do not add parent groups as extra tasks.
  4. Divide completed by total, multiply by 100 and round; with no endpoints expect 0%.
  5. Compare the displayed result, then use the correct completion control only for work actually finished.

Example: one of three, then one of four

Suppose a parent called Launch groups Write text and Choose image, while Check links is a separate final task. The group itself is not a fourth item: there are three final tasks. If one is complete, 1 ÷ 3 × 100 rounds to 33%.

Adding a fourth available final task without completing another makes the figure 25%. The earlier completion has not disappeared; the amount of counted work has changed. A five-minute item and a large item still have equal weight here.

Separate a project checkbox from day marks

A final task's checkbox in the project tree saves its completion directly. Pending project marks in My day are saved through Save results. Understand which screen you are using before expecting the percentage to change.

Mark a task complete when the task is actually complete. Do not add or remove work merely to make the number look better, and do not use a text-note save as a completion action.

Use the figure for its proper question

Whole-project progress is a count of recorded task completion, not hours worked, difficulty, money earned or a forecast of the finish date. Period statistics answer a different question about saved day records.

If the percentage surprises you, inspect available endpoint tasks and their completed states first. A collapsed branch changes what you see on screen, not the underlying task calculation.

Check the result before you finish

  • Count completed and available end tasks without counting parent groups again; compare the rounded percentage.
  • Check completion against real outputs. The project percentage measures task completion, not time spent or the share of today's work.

Questions about this guide

Does a parent with two subtasks count as three tasks?
The parent groups the work. When those subtasks are the available endpoints, the two endpoints are counted and the parent is not an extra item.
Why did 33% become 25% without undoing completion?
One completed task out of three rounds to 33%; one out of four is 25%. Check whether the number of available final tasks changed.
Is this my percentage of working hours?
No. Final tasks are weighted equally regardless of duration. Study-minute statistics and saved daily project results are separate measures.