PRACTICAL GUIDE · WINDOWS
Remove a task from today's plan and keep it in its project
An overloaded daily list does not always mean a project task should disappear. You may still need the work, just not among the actions selected for the current open day.
In My Day, removing a task's daily selection preserves the underlying project task. It changes the day's composition, so check both the shorter plan and the task that remains in the project.

Choose the daily row, not a different removal control
Open the intended day and find the project task. The × beside that daily task removes its selection from this day. It does not delete the project, clear the task's note or mark the work complete.
The × in Project calendar has another purpose: it clears a scheduled date. Identify the screen and the task before acting; the same symbol does not mean the same change everywhere.
Prepare a truthful daily plan
Wait for any save to finish and resolve unsaved board changes. Save intended pending daily marks with Save results, or discard accidental marks deliberately. Prefer removing an unfinished task you genuinely will not attempt today.
- Check the open day's date and identify the unfinished task you want to remove from its selection.
- Finish saving and resolve pending daily marks and learning-board changes without changing truthful results.
- Use × beside that task in the day, rather than the calendar's date-removal control.
- Open the original project and verify the task, its note, completion state and any existing date.
- Check the revised daily list and report. Select the task manually on a later day if it is still available and needed.
Example: keep a contact check for later
The project “Prepare materials” has three tasks selected today: choose illustrations, check captions and check a contact. There is time for the first two. Use × beside “Check a contact” in the open day. The daily list now contains two tasks.
Then open Projects. “Check a contact” should still exist, remain unfinished and retain the note “Open the saved contact and verify the address.” If it had a calendar date, that date stays unless you change it separately. No new date or automatic tomorrow selection is created.
Understand the change to reporting
The removed daily selection no longer belongs to that day's task set. This can change the daily report's planned total and its completion percentage. Preserving a project task does not preserve the removed row in the daily report.
Do not remove correctly recorded completed work simply to improve a percentage. If you later need the task again, choose it manually when it is an available unfinished task; removing it is not a postponement schedule.
Verify the two places
Confirm that the row is absent from the open day, then check the original task's title, note, date and completion state in its project. Those checks distinguish a smaller daily selection from a changed project.
See the project-planning guide for task structure and the weekly review for interpreting results. Setup is explained in the installation guide. Access is 30 USDT per calendar year for one computer; each second computer needs its own licence.
Check the result before you finish
- Confirm the task has left the open day, then find the original task and its note in the project.
- Check its completion and calendar date separately. Removing a daily selection does not remove the project task or its date.
Questions about this guide
- Will the project task be deleted?
- No. This action removes the task's selection from the open day. Verify the original task in its project afterwards.
- Will it automatically move to tomorrow?
- No. Choosing another day or changing a calendar date requires a separate deliberate action.
- Will today's report stay exactly the same?
- No. Removing a selected row changes the day's task set and can change its planned total and percentage.