Build a home project checklist around measurements and checks

“Organise the shelf” can hide several different jobs: finding the usable space, choosing what belongs there and checking whether the arrangement is convenient. A checklist becomes useful when each task has an observable finish.

Use My Day to organise those decisions and retain your next step. Measurements and physical checks still happen in the room; the planner records what you enter and mark.

Painted illustration: two students planning their study at a library table.

Limit the result to one manageable area

Create “Organise one shelf” in Projects. Add groups for checking dimensions, preparing the space, and arranging and checking items. Under each group, create concrete leaf tasks without subtasks.

Keep “Measure usable width” separate from “Check depth and height.” Selecting a parent group's completion checkbox affects its descendants, so record an individual measurement on its own leaf task.

Write what a completed check will establish

In each task's Notes / where I left off, state what to measure or inspect and what remains uncertain. Enter real measurements only after taking them. A note can hold the next physical action, while an optional date identifies when you intend to do it.

  1. Create a project for one shelf and define what an organised result would look like.
  2. Add groups and separate leaf tasks for dimensions, preparation, placement and final access checks.
  3. Measure the actual space and save real values and remaining checks in the relevant task note.
  4. If useful, assign a date separately; select one available leaf task for the open day and do the physical work.
  5. Save its truthful daily result, then verify the shelf and keep all unperformed checks unfinished.

Example: width alone does not establish a fit

Suppose a fictional shelf has 78 cm of usable width and three fictional boxes are 24 cm wide each. Three times 24 gives 72 cm, which addresses width only. It says nothing about depth, height, access or any unchecked constraint.

Today you select only “Measure usable width.” After measuring your own shelf, put your actual value in its note, save the editor and record that completed daily task. Leave “Check depth and height” open until you perform those checks. Do not copy 78 cm into your project as though it were a measurement of your room.

Prepare and arrange after the required checks

Other leaf tasks might be “Choose items for this shelf,” “Clear the chosen surface,” “Place the selected items” and “Check access to the things I use.” Give each a result you can inspect.

Before changing tasks, finish saving and resolve pending daily marks or board changes. An editor's Save retains its note; Save results retains pending daily completion marks. Saving a measurement note alone does not complete the daily task.

Remove a task from today's plan and keep it in its project ↗

Verify the physical result

Return to the shelf and compare it with the project's open checks. A finished width measurement does not finish all dimensions or the arrangement. My Day does not measure objects, order boxes, manage a budget or assess installation and load capacity.

See the project-planning and next-action guides for choosing small tasks. The installation guide explains setup. Access costs 30 USDT per calendar year for one computer. A second computer needs its own licence.

Check the result before you finish

  • Compare the physical shelf with the saved measurements and the project's still-open checks.
  • Finish width, depth, height and access checks only after each real check. One measurement does not complete the whole arrangement.

Questions about this guide

Can I complete all dimensions after checking only width?
No. Width, depth and height are separate checks; finish each only when you have actually checked it.
Will entering three box sizes make the app verify that they fit?
No. The example illustrates a width calculation. You perform the measurements, comparison and remaining physical checks yourself.
Does the project order supplies or create reminders?
No. Notes and dates help you plan your own actions; purchases and external reminders are not performed by this workflow.